{"data":{"id":"us-ky/krs-184.100","jurisdiction":"us-ky","citation":"KRS 184.100","heading":"Approval of plans and specifications by board -- Preliminary costs.","body":"Upon qualification of the members of the board of directors, the board shall take up with\nits engineer the plans and specifications proposed for the construction or maintenance of\nthe road, and may make such changes therein as may, within the scope of the\nimprovement or maintenance petition for, appear necessary. The cost of preparation of\nsuch plans and specifications and any other reasonable costs borne by the sponsors of the\nproject prior to the organization of the district which are properly proved by v ouchers\nshall be included in the cost of construction of the project and shall be repaid to such\nsponsors out of moneys collected or received for the construction of such project.","path":["KRS Chapter 184"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=5890","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:51:36Z","sha256":"f7bed30a36218186b7f13127cf9ff257ab454095307a707ff9e58837530eca7f","source_id":"us-ky","stale":false,"prev":"us-ky/krs-184.090","next":"us-ky/krs-184.110"},"notice":"GroundRules: Original legal text. Not legal advice."}
