{"data":{"id":"us-ky/krs-198b.135","jurisdiction":"us-ky","citation":"KRS 198B.135","heading":"Presumption regarding defectiveness of building design, construction,","body":"materials, or supplies where injury, death, or damage occurs more than five\nyears after completion or incorporation.\nIn any action alleging defective building design, construction,  materials, or supplies\nwhere the injury, death, or property damage occurs more than five (5) years after the date\nof completion of construction or incorporation of materials or supplies into the building,\nthere shall be a presumption that the building was  not defective in design, construction,\nmaterials, or supplies. This presumption may be overcome by a preponderance of the\nevidence to the contrary.","path":["KRS Chapter 198B"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=6979","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:51:51Z","sha256":"23528177117d7fce66c9929bf049452e6684955d404a18ba79758e669447b627","source_id":"us-ky","stale":false,"prev":"us-ky/krs-198b.130","next":"us-ky/krs-198b.140"},"notice":"GroundRules: Original legal text. Not legal advice."}
