{"data":{"id":"us-ky/krs-353.745","jurisdiction":"us-ky","citation":"KRS 353.745","heading":"Location of well's gathering lines to be marked.","body":"(1) For gathering lines installed across terrain with a slope of greater than twenty\ndegrees (20Âº), the well operator shall mark the location of the gathering lines with\nline markers at interval distances not to exceed two hundred fifty (250) feet.\n(2) The Di vision of Oil and Gas shall make available on its Web site maps or other\nrelevant information showing the location of gathering lines, as filed by the well\noperator, within thirty (30) days of the information being filed.\n(3) Prior to the issuance of a per mit to drill, the division shall determine whether the\nproposed well will intersect an active mining area by reviewing the pertinent mine\nmaps filed with the Division of Mine Safety. If the proposed well will intersect with\nan active mining area, the Division of Oil and Gas shall:\n(a) Determine whether the coal mine permittee has been properly notified\npursuant to KRS 353.050; and\n(b) Issue the permit to drill on the condition that a directional survey be\nperformed pursuant to KRS 353.739(1).\n(4) In order to perform the duties under this section, the Division of Oil and Gas shall\ncreate and adequately staff the positions required to perform the duties. The division\nmay charge an administrative fee not to exceed fifty dollars ($50) per permit\napplication to perform its duties under this section.","path":["KRS Chapter 353"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=44555","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:58:40Z","sha256":"db7bd76ab92f89af43ec6aa852555704a706d89a9c4ba3b83037726054892e9c","source_id":"us-ky","stale":false,"prev":"us-ky/krs-353.743","next":"us-ky/krs-353.747"},"notice":"GroundRules: Original legal text. Not legal advice."}
