{"data":{"id":"us-ky/krs-45a.181","jurisdiction":"us-ky","citation":"KRS 45A.181","heading":"Requirements for request for proposal when capital project is to be","body":"constructed utilizing the design-build construction method.\nWhen a capital project is to be constructed utilizing the design -build construction method\nin accordance with KRS 45A.180, the percentage of scoring to be attributed to the\nguaranteed maximum price shall be stated in the request for proposal. A request for\nproposal may allow for the payment of stipends for the technical proposal phase provided\nthat the amount of the stipends a nd the terms under which stipends are to be paid are\nstated in the request for proposal.","path":["KRS Chapter 45A"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=22363","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:49:06Z","sha256":"7fd34bba602d8f1cae9ff967ee83e35904ff0af08d096b2043c4bb310c70e884","source_id":"us-ky","stale":false,"prev":"us-ky/krs-45a.180","next":"us-ky/krs-45a.182"},"notice":"GroundRules: Original legal text. Not legal advice."}
