{"data":{"id":"us-ky/krs-76.248","jurisdiction":"us-ky","citation":"KRS 76.248","heading":"District may construct or contract for construction -- No debts incurred","body":"until assessment final.\nThe district may carry out the plan itself or contract with others for construction of the\nsewerage facilities. The district shall incur no debts or obligations, aside from engineering\nstudy and administrative costs, on account of the construction subdistrict until an order\nmade under KRS 76.246 is final and no longer appealable.","path":["KRS Chapter 76"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=24513","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:49:36Z","sha256":"4c353e71cf7d006be3edad49aaf7b8563acd97096014d80c4bdfb868f655932d","source_id":"us-ky","stale":false,"prev":"us-ky/krs-76.247","next":"us-ky/krs-76.249"},"notice":"GroundRules: Original legal text. Not legal advice."}
