{"data":{"id":"us-ky/krs-76.330","jurisdiction":"us-ky","citation":"KRS 76.330","heading":"Commission to make survey and report to county judge/executive of","body":"economic feasibility of construction -- Certification by metropolitan district.\nThe commission shall, before entering upon any construction work or any contracts\ntherefor, make a survey of the territory within the district, and report to the county\njudge/executive as to plans for sewer and/or drainage construction and as to the estimated\ncost thereof, with recommendations as to whether or not such construction is\neconomically feasible. With such report shall be submitted a report and certification from\nthe metropolitan sewer district as to whether or not the project is feasible from a technical\nand economic standpoint.","path":["KRS Chapter 76"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=24555","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:49:36Z","sha256":"8fd06041cd751f1ef1a362618a1384ef5d2d7f62c6890fd2cd726de0aee03a42","source_id":"us-ky","stale":false,"prev":"us-ky/krs-76.326","next":"us-ky/krs-76.335"},"notice":"GroundRules: Original legal text. Not legal advice."}
