{"data":{"id":"us-ky/krs-76.355","jurisdiction":"us-ky","citation":"KRS 76.355","heading":"Performance under plan.","body":"When the classification and ratio between classes on any specific plan, has been finally\ndetermined, the commission may carry out the plan itself, or contract for construction of\nsaid sewers and/or drains included in the plan by the metropolitan sewer dist rict or\notherwise.","path":["KRS Chapter 76"],"source_url":"https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=24560","current_through":"Includes enactments through the 2026 Regular Session","vintage":"09/05/2026","retrieved_at":"2026-09-05T20:49:36Z","sha256":"813f401efc4d1bd56fd65849a84e1677d8c384dd0356f5269cb0f6ad73bb59c0","source_id":"us-ky","stale":false,"prev":"us-ky/krs-76.350","next":"us-ky/krs-76.360"},"notice":"GroundRules: Original legal text. Not legal advice."}
