{"data":{"id":"us-ma/mass.-gen.-laws-ch.-146-50c","jurisdiction":"us-ma","citation":"Mass. Gen. Laws ch. 146, § 50C","heading":"Nuclear power plant operators and engineers; minimum supervising and shift requirements","body":"Section 50C. Every nuclear power plant shall have at least one nuclear power plant senior supervising engineer. One nuclear power plant operating engineer and one assistant nuclear power plant operator shall be the minimum requirement for each working shift.","path":["Part I","Title XX","Chapter 146"],"source_url":"https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter146/Section50C","current_through":"amendments passed before May 31, 2026","vintage":"","retrieved_at":"2026-09-17T05:23:24Z","sha256":"ce63b26cfb69bfa8b85f24d2840b2884ef39aaf11391a1ecbba0f3a57525094f","source_id":"us-ma","stale":false,"prev":"us-ma/mass.-gen.-laws-ch.-146-50b","next":"us-ma/mass.-gen.-laws-ch.-146-51"},"notice":"GroundRules: Original legal text. Not legal advice."}
