{"data":{"id":"us-ma/mass.-gen.-laws-ch.-149a-14","jurisdiction":"us-ma","citation":"Mass. Gen. Laws ch. 149A, § 14","heading":"Design build contracts","body":"Section 14. Notwithstanding section 39M of chapter 30, for each contract for the construction, reconstruction, alteration, remodeling or repair of a public works project by an awarding authority and estimated by the awarding authority to cost not less than $5,000,000, the awarding authority may utilize design build for the construction, reconstruction, alteration, remodeling or repair of any public works project pursuant to this section and sections 15 to 21, inclusive; but, before using the design build, the awarding authority shall seek the approval of the inspector general pursuant to section 16.","path":["Part I","Title XXI","Chapter 149A"],"source_url":"https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXXI/Chapter149A/Section14","current_through":"amendments passed before May 31, 2026","vintage":"","retrieved_at":"2026-09-17T05:23:30Z","sha256":"ae0885559c528e5a7448d31ec2306baa605f581b439b673e0cb0f2cef1d5d77e","source_id":"us-ma","stale":false,"prev":"us-ma/mass.-gen.-laws-ch.-149a-13","next":"us-ma/mass.-gen.-laws-ch.-149a-15"},"notice":"GroundRules: Original legal text. Not legal advice."}
