{"data":{"id":"us-ma/mass.-gen.-laws-ch.-161-76","jurisdiction":"us-ma","citation":"Mass. Gen. Laws ch. 161, § 76","heading":"Cost of temporary tracks constructed due to alteration of grade crossing","body":"Section 76. If such bridge is altered, rebuilt, improved or repaired under sections fifty-nine to sixty-four, inclusive, of chapter one hundred and fifty-nine, the cost of construction of the tracks upon and over such temporary location shall be reckoned as a part of the charges and expenses of the alteration, improvement or repair of the crossing, to be apportioned by the special commission as provided thereunder.","path":["Part I","Title XXII","Chapter 161"],"source_url":"https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXXII/Chapter161/Section76","current_through":"amendments passed before May 31, 2026","vintage":"","retrieved_at":"2026-09-17T05:23:49Z","sha256":"165ccb00ed56c2e91035a2cce23f2051cd413ae14ea95604de37d08a575f7299","source_id":"us-ma","stale":false,"prev":"us-ma/mass.-gen.-laws-ch.-161-75","next":"us-ma/mass.-gen.-laws-ch.-161-77"},"notice":"GroundRules: Original legal text. Not legal advice."}
