{"data":{"id":"us-md/md.-code-public-safety-12-605","jurisdiction":"us-md","citation":"Md. Code, Public Safety § 12–605","heading":"","body":"(a) Before a utility authorizes electrical current to be turned on for a premise or structure, the utility must receive a cut–in certificate from a certified nongovernmental electrical inspector or governmental unit that is qualified to issue electrical inspection certificates.\n(b) Within 15 days after completion, each electrical installation shall be certified by a certified nongovernmental electrical inspector or a governmental unit that is qualified to issue electrical inspection certificates.","path":["Article - Public Safety"],"source_url":"https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=gps\u0026section=12-605","current_through":"2026-01-01","vintage":"","retrieved_at":"2026-09-14T20:00:18Z","sha256":"9dda88a34d439651191d47d144732d50d041a474b56a059af91a3cd1b8f5130c","source_id":"us-md","stale":false,"prev":"us-md/md.-code-public-safety-12-604","next":"us-md/md.-code-public-safety-12-606"},"notice":"GroundRules: Original legal text. Not legal advice."}
