{"data":{"id":"us-md/md.-code-public-utilities-7-1004","jurisdiction":"us-md","citation":"Md. Code, Public Utilities § 7–1004","heading":"","body":"(a) On or before May 1, 2025, the Commission shall adopt regulations to:\n(1) establish expedited processes for interconnecting the following systems to the electric distribution system:\n(i) bidirectional electric vehicle systems capable of providing electricity to the electric distribution system; and\n(ii) bidirectional electric vehicle systems that do not provide electricity to the electric distribution system but do provide electricity to a home, business, or other structure serviced by an investor–owned electric company; and\n(2) provide investor–owned electric companies with adequate time to ensure electric distribution system reliability in advance of the interconnections described in item (1) of this subsection.\n(b) An investor–owned electric company:\n(1) may require a customer to provide notice to the investor–owned electric company if the customer installs a bidirectional electric vehicle system described in subsection (a)(1)(ii) of this section; and\n(2) shall require a customer to apply for interconnection if the customer configures a bidirectional electric vehicle system to provide electricity to the electric distribution system.\n(c) A municipal electric utility or an electric cooperative may comply with the requirements of subsection (b) of this section in the same manner as an investor–owned electric company.","path":["Article - Public Utilities"],"source_url":"https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=gpu\u0026section=7-1004","current_through":"2026-01-01","vintage":"","retrieved_at":"2026-09-14T20:00:28Z","sha256":"e62f5638e701f96ab8caa60832d76ff46215aa1c947a6b6fc7c944a72cb6cbea","source_id":"us-md","stale":false,"prev":"us-md/md.-code-public-utilities-7-1003","next":"us-md/md.-code-public-utilities-7-1005"},"notice":"GroundRules: Original legal text. Not legal advice."}
