{"data":{"id":"us-md/md.-code-public-utilities-7-523","jurisdiction":"us-md","citation":"Md. Code, Public Utilities § 7–523","heading":"","body":"(a) The Commission may require that a deferral of expenses under a rate stabilization plan be either voluntary or mandatory if the Commission finds that the required type of deferral is in the public interest.\n(b) The rate stabilization plan may provide that a deferral shall be secured through the issuance of rate stabilization bonds authorized by a qualified rate order under this part.","path":["Article - Public Utilities"],"source_url":"https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=gpu\u0026section=7-523","current_through":"2026-01-01","vintage":"","retrieved_at":"2026-09-14T20:00:28Z","sha256":"10d9ed8714bcf082575c09ba6bc3d6d50ff6efa19c82fb0c8620fdaed96c8413","source_id":"us-md","stale":false,"prev":"us-md/md.-code-public-utilities-7-522","next":"us-md/md.-code-public-utilities-7-524"},"notice":"GroundRules: Original legal text. Not legal advice."}
