{"data":{"id":"us-md/md.-code-public-utilities-7-714","jurisdiction":"us-md","citation":"Md. Code, Public Utilities § 7–714","heading":"","body":"The developer of a solar energy generating system that has a generating capacity over 1 megawatt, as measured by the alternating current rating of the system’s inverter, shall ensure that workers are paid not less than the prevailing wage rate determined under Title 17, Subtitle 2 of the State Finance and Procurement Article.","path":["Article - Public Utilities"],"source_url":"https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=gpu\u0026section=7-714","current_through":"2026-01-01","vintage":"","retrieved_at":"2026-09-14T20:00:28Z","sha256":"05ebff05a769f52a5783aea759e7dfb1278f8aa4c8aa7956ad86043ad5413abe","source_id":"us-md","stale":false,"prev":"us-md/md.-code-public-utilities-7-713","next":"us-md/md.-code-public-utilities-7-801"},"notice":"GroundRules: Original legal text. Not legal advice."}
