{"data":{"id":"us-me/10-m.r.s.-3852","jurisdiction":"us-me","citation":"10 M.R.S. §3852","heading":"Labor and materials; owners of dry docks or marine railways","body":"A person who furnishes labor or materials for building a vessel has a lien on it for the labor and materials, which may be enforced by attachment of the vessel within 4 days after it is launched, but if the labor and materials have been so furnished by virtue of a contract not fully completed at the time of the launching of the vessel, the lien may be enforced within 4 days after the contract has been completed.  The person has a lien on the materials furnished before they become part of the vessel, which may be enforced by attachment.  The owners of a dry dock or marine railway used for a vessel have a lien on the vessel for the use of the dock or railway, to be enforced by attachment within 4 days after the last day in which the dock or railway is used or occupied by the vessel.","path":["TITLE 10: COMMERCE AND TRADE","PART 7: LIENS","CHAPTER 627: VESSELS"],"source_url":"https://legislature.maine.gov/statutes/10/title10sec3852.html","current_through":"October 1, 2025","vintage":"","retrieved_at":"2026-09-04T15:12:24Z","sha256":"7baf4eab7bbba32090e9247ba07dce54c0cbbf4264109a3fe0afaeeeff687dff","source_id":"us-me","stale":false,"prev":"us-me/10-m.r.s.-3851","next":"us-me/10-m.r.s.-3853"},"notice":"GroundRules: Original legal text. Not legal advice."}
