{"data":{"id":"us-me/23-m.r.s.-654","jurisdiction":"us-me","citation":"23 M.R.S. §654","heading":"Detour roads and signs","body":"Before a state or state-aid highway is closed due to construction, the department shall establish a practical detour route and properly sign the route at all intersections.  The detour route shall be maintained in a condition adequate to serve traffic until the state or state-aid highway under construction is opened to traffic.  Upon completion of the construction project all detour signs shall be removed.","path":["TITLE 23: TRANSPORTATION","PART 1: STATE HIGHWAY LAW","CHAPTER 11: LAYING OUT, ALTERING AND DISCONTINUING HIGHWAYS"],"source_url":"https://legislature.maine.gov/statutes/23/title23sec654.html","current_through":"October 1, 2025","vintage":"","retrieved_at":"2026-09-04T15:12:32Z","sha256":"a59d664f1e917c53daa675fd4adfae40a67af1e7269a32455cd56ec636b58839","source_id":"us-me","stale":false,"prev":"us-me/23-m.r.s.-653","next":"us-me/23-m.r.s.-701"},"notice":"GroundRules: Original legal text. Not legal advice."}
