{"data":{"id":"us-me/25-m.r.s.-2923-c","jurisdiction":"us-me","citation":"25 M.R.S. §2923-C","heading":"Cost reporting","body":"1.  Reporting requirements.  Annually, on a date prescribed by the Public Utilities Commission by rule, a public safety answering point and dispatch center shall each provide the bureau with a report of the costs incurred by the public safety answering point or dispatch center for the provision of 9-1-1 services.\n2.  Rules.  The Public Utilities Commission shall adopt rules to implement this section. The rules must establish requirements for the report provided by a public safety answering point and dispatch center pursuant to subsection 1, including, at a minimum:\nA.  The manner by which the report must be submitted to the bureau;\nB.  The specific cost components for the provision of 9-1-1 services to be included in the report; and\nC.  The date by which the report must be submitted.\nRules adopted pursuant to this subsection are routine technical rules pursuant to Title 5, chapter 375, subchapter 2‑A.","path":["TITLE 25: INTERNAL SECURITY AND PUBLIC SAFETY","PART 8: MAINE CRIMINAL JUSTICE ACADEMY","CHAPTER 352: EMERGENCY SERVICES COMMUNICATION"],"source_url":"https://legislature.maine.gov/statutes/25/title25sec2923-C.html","current_through":"January 1, 2026","vintage":"","retrieved_at":"2026-09-04T15:12:34Z","sha256":"127c0425ac9fb2203fb4da254f583daeca84b80b93e70fd54ec662c3717a9b46","source_id":"us-me","stale":false,"prev":"us-me/25-m.r.s.-2923-b","next":"us-me/25-m.r.s.-2924"},"notice":"GroundRules: Original legal text. Not legal advice."}
