{"data":{"id":"us-me/35-a-m.r.s.-3455","jurisdiction":"us-me","citation":"35-A M.R.S. §3455","heading":"Determination of public safety-related setbacks","body":"In making findings pursuant to Title 12, section 685‑B, subsection 4 or Title 38, section 484, subsection 3 on whether a wind energy development must be constructed with setbacks adequate to protect public safety, the primary siting authority must consider the recommendation of a professional, licensed civil engineer as well as any applicable setback recommended by a manufacturer of the generating facilities.  The primary siting authority may require submission of this information as part of the application.","path":["TITLE 35-A: PUBLIC UTILITIES","PART 3: ELECTRIC POWER","CHAPTER 34-A: EXPEDITED PERMITTING OF GRID-SCALE WIND ENERGY DEVELOPMENT"],"source_url":"https://legislature.maine.gov/statutes/35-A/title35-Asec3455.html","current_through":"October 1, 2025","vintage":"","retrieved_at":"2026-09-04T15:12:40Z","sha256":"0d10a5fac41733c0d11ba79d389cfebbc0da5b598a752b14e5b5aaf24fb75aa3","source_id":"us-me","stale":false,"prev":"us-me/35-a-m.r.s.-3454","next":"us-me/35-a-m.r.s.-3456"},"notice":"GroundRules: Original legal text. Not legal advice."}
