{"data":{"id":"us-me/37-b-m.r.s.-1116","jurisdiction":"us-me","citation":"37-B M.R.S. §1116","heading":"Design standards","body":"All new dams that reasonably will be classified as high or significant hazard potential dams must be designed, constructed or reconstructed under the supervision of a registered professional engineer.  Prior to construction, the dam owner shall provide a copy of the plans and specifications to the department.","path":["TITLE 37-B: DEFENSE, VETERANS AND EMERGENCY MANAGEMENT","CHAPTER 24: DAM SAFETY"],"source_url":"https://legislature.maine.gov/statutes/37-B/title37-Bsec1116.html","current_through":"October 1, 2025","vintage":"","retrieved_at":"2026-09-04T15:12:41Z","sha256":"6444511a7cc963cf6201f64ef45d24ffe0a66e24901441a9d1afe0e7635c26e6","source_id":"us-me","stale":false,"prev":"us-me/37-b-m.r.s.-1115","next":"us-me/37-b-m.r.s.-1117"},"notice":"GroundRules: Original legal text. Not legal advice."}
