{"data":{"id":"us-me/38-m.r.s.-1310-z","jurisdiction":"us-me","citation":"38 M.R.S. §1310-Z","heading":"Laboratory analyses","body":"Laboratory analyses required in support of the licensing, operation, closure or postclosure care of a solid waste facility must be performed by a qualified laboratory.  Six months after the adoption of laboratory certification rules required by Title 22, section 567, all laboratories must be certified or exempted from certification pursuant to those rules.","path":["TITLE 38: WATERS AND NAVIGATION","CHAPTER 13: WASTE MANAGEMENT","SUBCHAPTER 1-A: SOLID WASTE","ARTICLE 3: SOLID WASTE FACILITY SITING"],"source_url":"https://legislature.maine.gov/statutes/38/title38sec1310-Z.html","current_through":"October 1, 2025","vintage":"","retrieved_at":"2026-09-04T15:12:41Z","sha256":"47ad2d028e2aaebf097a7aa123e69e091bcaa109bdf2dd1f3e625ac35f714234","source_id":"us-me","stale":false,"prev":"us-me/38-m.r.s.-1310-y","next":"us-me/38-m.r.s.-1310-aa"},"notice":"GroundRules: Original legal text. Not legal advice."}
