{"data":{"id":"us-mi/mich.-comp.-laws-408.1103","jurisdiction":"us-mi","citation":"Mich. Comp. Laws § 408.1103","heading":"Prevailing wage and fringe benefit rates; schedule as part of specifications and bid form.","body":"Sec. 3.\n\nA contracting agent, before advertising for bids on a state project, shall have the commissioner determine the prevailing rates of wages and fringe benefits for all classes of construction mechanics called for in the contract. A schedule of these rates shall be made a part of the specifications for the work to be performed and shall be printed on the bidding forms where the work is to be done by contract. If a contract is not awarded or construction undertaken within 90 days of the date of the commissioner's determination of prevailing rates of wages and fringe benefits, the commissioner shall make a redetermination before the contract is awarded.","path":["MI Code","Chapter 408","Act Act-10-of-2023"],"source_url":"https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-408-1103","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:31Z","sha256":"ec9cd3cdb0ffd8ebad7dd69de9fb7eb309e230556bd641a7d6bc90f3c5172e4b","source_id":"us-mi","stale":false,"prev":"us-mi/mich.-comp.-laws-408.1102a","next":"us-mi/mich.-comp.-laws-408.1104"},"notice":"GroundRules: Original legal text. Not legal advice."}
