{"data":{"id":"us-mi/mich.-comp.-laws-445.887","jurisdiction":"us-mi","citation":"Mich. Comp. Laws § 445.887","heading":"Owner-builder notice; requirements.","body":"Sec. 7.\n\n(1) An owner-builder who sells the residential structure, within 2 years or less after the date of the issuance of the occupancy permit, shall note in the owner-builder notice the fact that the residential structure was built by the owner.\n\n(2) An owner-builder shall supply, at the time of offering the residential structure and on a separate sheet of paper, an owner-builder notice stating in 12-point font or larger that the residential structure was built by an owner-builder that is not a licensed builder. The notice shall be signed and dated by the owner-builder.","path":["MI Code","Chapter 445","Act Act-6-of-2008"],"source_url":"https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-445-887","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:31Z","sha256":"9c3cb1a42f0df67f344bd93aad6723a4b3bbb6b1b19810cdcb624adce2b91c7e","source_id":"us-mi","stale":false,"prev":"us-mi/mich.-comp.-laws-445.885","next":"us-mi/mich.-comp.-laws-445.889"},"notice":"GroundRules: Original legal text. Not legal advice."}
