{"data":{"id":"us-mi/mich.-comp.-laws-462.305","jurisdiction":"us-mi","citation":"Mich. Comp. Laws § 462.305","heading":"Order of department.","body":"Sec. 305.\n\nAn order of the department need not specify the details of the construction, repair, or reconstruction of a physical grade crossing unless the circumstances surrounding a particular grade crossing so require. An order of the department shall take into consideration time required for design, acquisition of materials, and construction time, including seasonal difficulties, and the volume of similar projects pending.","path":["MI Code","Chapter 462","Act Act-354-of-1993"],"source_url":"https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-462-305","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:31Z","sha256":"4f84785345ab440baada82a89be1871489585ab7535d15060d91be65a70bfb71","source_id":"us-mi","stale":false,"prev":"us-mi/mich.-comp.-laws-462.303","next":"us-mi/mich.-comp.-laws-462.307"},"notice":"GroundRules: Original legal text. Not legal advice."}
