{"data":{"id":"us-mn/minn.-stat.-103e.265","jurisdiction":"us-mn","citation":"Minn. Stat. § 103E.265","heading":"ORDER FOR DETAILED SURVEY AND SURVEY REPORT.","body":"Subdivision 1. Order.\nWhen the preliminary hearing order is filed with the auditor, the drainage authority shall order the engineer to make a detailed survey with plans and specifications for the proposed drainage project and submit a detailed survey report to the drainage authority as soon as possible.\nSubd. 2. Waiver.\nThe drainage authority may waive the detailed survey order and the detailed survey if it determines that adequate data, plans, and specifications have been furnished by a United States engineer.","path":["WATER","CHAPTER 103E. DRAINAGE","DETAILED SURVEY AND VIEWING"],"source_url":"https://www.revisor.mn.gov/statutes/cite/103E.265","current_through":"2025 Minnesota Statutes","vintage":"","retrieved_at":"2026-09-02T22:10:30Z","sha256":"44e4d10b5391b7e500ee6027cfb0e670b5cf0d21eae77ef80ddb08c322d5cce8","source_id":"us-mn","stale":false,"prev":"us-mn/minn.-stat.-103e.261","next":"us-mn/minn.-stat.-103e.271"},"notice":"GroundRules: Original legal text. Not legal advice."}
