{"data":{"id":"us-mn/minn.-stat.-103e.521","jurisdiction":"us-mn","citation":"Minn. Stat. § 103E.521","heading":"CONSTRUCTION SUPERVISION.","body":"The drainage authority shall require the engineer to supervise and inspect the construction under contract. The drainage authority shall cause the contracts under this chapter to be performed properly.","path":["WATER","CHAPTER 103E. DRAINAGE","CONSTRUCTING DRAINAGE PROJECT"],"source_url":"https://www.revisor.mn.gov/statutes/cite/103E.521","current_through":"2025 Minnesota Statutes","vintage":"","retrieved_at":"2026-09-02T22:10:30Z","sha256":"51ee14f4ab71b6c9e13e9e0b6998a249ec581a0a301a893262753ac4ce485c4a","source_id":"us-mn","stale":false,"prev":"us-mn/minn.-stat.-103e.515","next":"us-mn/minn.-stat.-103e.525"},"notice":"GroundRules: Original legal text. Not legal advice."}
