{"data":{"id":"us-mn/minn.-stat.-103e.541","jurisdiction":"us-mn","citation":"Minn. Stat. § 103E.541","heading":"EXTENDING TIME ON CONTRACTS.","body":"The auditors of affected counties may extend the time for the performance of a contract as provided in this section. The contractor may apply, in writing, for an extension of the contract. Notice of the application must be given to: (1) the engineer and the attorney for the petitioners; and (2) for a joint county drainage project, to the auditors of the affected counties. The auditors may grant an extension if sufficient reasons are shown. The extension does not affect a claim for liquidated damages that may arise after the original time expires and before an extension or a claim that may arise after the time for the extension expires.","path":["WATER","CHAPTER 103E. DRAINAGE","CONSTRUCTING DRAINAGE PROJECT"],"source_url":"https://www.revisor.mn.gov/statutes/cite/103E.541","current_through":"2025 Minnesota Statutes","vintage":"","retrieved_at":"2026-09-02T22:10:30Z","sha256":"afa6e59d057135a5896887fe3bbcfe41b64c3f92de5c5898f7b42f96840bddf5","source_id":"us-mn","stale":false,"prev":"us-mn/minn.-stat.-103e.535","next":"us-mn/minn.-stat.-103e.545"},"notice":"GroundRules: Original legal text. Not legal advice."}
