{"data":{"id":"us-mn/minn.-stat.-103g.305","jurisdiction":"us-mn","citation":"Minn. Stat. § 103G.305","heading":"TIME LIMIT TO ACT ON WATER-USE PERMIT APPLICATION.","body":"Subdivision 1. General 150-day limit.\n(a) Except as provided in subdivision 2, the commissioner must act on a water-use permit within 150 days after the completed application for the permit has been submitted. Within 30 business days of application for a water-use permit, the commissioner shall notify the applicant, in writing, whether the application is complete or incomplete.\n(b) The commissioner must direct a hearing to be held on a water-use permit application or make an order issuing a permit or denying a permit.\nSubd. 2. Exception.\nThe requirements of subdivision 1 do not apply to applications for a water-use permit for:\n(1) appropriations for diversion from the basin of origin of more than 2,000,000 gallons per day average in a 30-day period; or\n(2) appropriations with a consumptive use of more than 2,000,000 gallons per day average for a 30-day period.","path":["WATER","CHAPTER 103G. WATERS OF THE STATE","GENERAL PERMIT; PROCEDURE"],"source_url":"https://www.revisor.mn.gov/statutes/cite/103G.305","current_through":"2025 Minnesota Statutes","vintage":"","retrieved_at":"2026-09-02T22:10:30Z","sha256":"3231f967afb7a4016f9d513cee28ccedcd996988199918525ca37f2ac83d0836","source_id":"us-mn","stale":false,"prev":"us-mn/minn.-stat.-103g.301","next":"us-mn/minn.-stat.-103g.311"},"notice":"GroundRules: Original legal text. Not legal advice."}
