{"data":{"id":"us-mn/minn.-stat.-161.3416","jurisdiction":"us-mn","citation":"Minn. Stat. § 161.3416","heading":"DESIGN-BUILD NOTICE; REPORT.","body":"Subdivision 1. Summary report of reasons for determination.\nThe commissioner shall summarize in a written statement its reasons for using the design-build construction contracting procedure. This statement, along with other relevant information describing the project, must be made available upon request to interested parties.\nSubd. 2. Final determination authority.\nFinal determination to use a design-build construction contracting procedure may be made only by the commissioner.","path":["TRANSPORTATION","CHAPTER 161. TRUNK HIGHWAYS","CONSTRUCTION AND MAINTENANCE CONTRACTS"],"source_url":"https://www.revisor.mn.gov/statutes/cite/161.3416","current_through":"2025 Minnesota Statutes","vintage":"","retrieved_at":"2026-09-02T22:10:35Z","sha256":"ebc13855b65ee240ef202670f2f33387701d24d387a71e346bf5115241ed59ca","source_id":"us-mn","stale":false,"prev":"us-mn/minn.-stat.-161.3414","next":"us-mn/minn.-stat.-161.3418"},"notice":"GroundRules: Original legal text. Not legal advice."}
