{"data":{"id":"us-ms/miss.-code-ann.-17-17-123","jurisdiction":"us-ms","citation":"Miss. Code Ann. § 17-17-123","heading":"Miss. Code Ann. § 17-17-123","body":"Prior to undertaking the financing of a project, the governing board shall obtain a finding of the authority that the facility is necessary and that the design thereof will result in the collection, processing, generation, distributing, recycling, elimination and/or disposal of any type of waste product from which operation conditions result in or pose a substantial present, future or potential hazard to human health or the environment when improperly treated, stored, transported or disposed of or otherwise managed.","path":["MS Code","Title 17"],"source_url":"https://legislature.ms.gov/","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:17Z","sha256":"6cb77bc2ef6682f846e3713c6fab857664d43689ee70a7758cadf0432ab2b155","source_id":"us-ms","stale":false,"prev":"us-ms/miss.-code-ann.-17-17-121","next":"us-ms/miss.-code-ann.-17-17-125"},"notice":"GroundRules: Original legal text. Not legal advice."}
