{"data":{"id":"us-ms/miss.-code-ann.-31-5-52","jurisdiction":"us-ms","citation":"Miss. Code Ann. § 31-5-52","heading":"Miss. Code Ann. § 31-5-52","body":"The use of either the design-build method of project delivery as provided in Section 31-7-13.1 or the construction manager at risk method of project delivery as provided in Section 31-7-13.2 must comply with the provisions of Section 31-5-51 .","path":["MS Code","Title 31"],"source_url":"https://legislature.ms.gov/","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:17Z","sha256":"b13335ec3aa53b5d2d621488b4842ffc8e734d82a4009fa906c25de4bc90014d","source_id":"us-ms","stale":false,"prev":"us-ms/miss.-code-ann.-31-5-51","next":"us-ms/miss.-code-ann.-31-5-53"},"notice":"GroundRules: Original legal text. Not legal advice."}
