{"data":{"id":"us-ms/miss.-code-ann.-49-17-111","jurisdiction":"us-ms","citation":"Miss. Code Ann. § 49-17-111","heading":"Miss. Code Ann. § 49-17-111","body":"Prior to undertaking the financing of any pollution control facility, the governing board shall obtain a finding of the pollution authority that the pollution control facilities are necessary and that the design thereof will result in the elimination, mitigation and/or prevention of air or water pollution.","path":["MS Code","Title 49"],"source_url":"https://legislature.ms.gov/","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:17Z","sha256":"7637fac2f4cfed20206809932afdcad876609f274bff05899e3b041054b3d7c1","source_id":"us-ms","stale":false,"prev":"us-ms/miss.-code-ann.-49-17-109","next":"us-ms/miss.-code-ann.-49-17-113"},"notice":"GroundRules: Original legal text. Not legal advice."}
