{"data":{"id":"us-ms/miss.-code-ann.-77-5-259","jurisdiction":"us-ms","citation":"Miss. Code Ann. § 77-5-259","heading":"Limitation for billing errors.","body":"In any action or regulatory proceeding arising from any overbilling or underbilling by a corporation, no collection, reimbursement, or other relief may be awarded for underbillings or overbillings occurring more than six (6) years prior to the commencement of the action or regulatory proceeding.","path":["Title 77. Public Utilities and Carriers","Chapter 5. Electric Power","Article 5. Electric Power Associations."],"source_url":"https://archive.org/download/gov.ms.code.ann.2018/release78.2020.07.08/gov.ms.code.title.77.odt","current_through":"2020-07-08","vintage":"Mississippi Code Release 78 (2020-07), retrieved 2026-09-17","retrieved_at":"2026-10-27T05:54:18Z","sha256":"63b5ab1644d1c64ace05ed1084bd63fb4134c3feb27822df3a105e18a3cf5e06","source_id":"us-ms","stale":false,"prev":"us-ms/miss.-code-ann.-77-5-257","next":"us-ms/miss.-code-ann.-77-5-301","notices":[{"id":"open-us-law","title":"Open US Law compilation","text":"Compilation CC BY 4.0, Open US Law (Vaquill AI). GroundRules uses only the releases published under CC BY 4.0: from v2026.09 the compilation is licensed CC BY-NC 4.0, and GroundRules does not use those releases. Each affected row names its release in its vintage label. GroundRules parsed and filtered the compilation to retain enacted text.","url":"https://huggingface.co/datasets/vaquill/open-us-law","license_url":"https://creativecommons.org/licenses/by/4.0/"},{"id":"pro-ms","title":"Mississippi Release 78 supplement","text":"Mississippi electronic product files were republished by Public.Resource.Org under a public-domain dedication. GroundRules uses enacted text from Release 78 only as a labeled supplement to the newer Open US Law rows.","url":"https://archive.org/details/gov.ms.code.ann.2018"}]},"notice":"GroundRules: Original legal text. Not legal advice."}
