{"data":{"id":"us-mt/28-2-2110","jurisdiction":"us-mt","citation":"28-2-2110","heading":"Limit on retainage.","body":"(1) The maximum retainage applied to construction contracts subject to the provisions of this part may not exceed 5%.\n(2) The retainage percentage withheld by an owner, as provided in subsection (1), from a construction contractor is the maximum retainage that a construction contractor may withhold from a subcontractor.\n(3) Retainage must be released upon the final acceptance of each portion of work for which a separate price is stated in the construction contract.","path":["TITLE 28. CONTRACTS AND OTHER OBLIGATIONS","CHAPTER 2. CONTRACTS","Part 21. Payment of Construction Contractors and Subcontractors"],"source_url":"https://mca.legmt.gov/bills/mca/title_0280/chapter_0020/part_0210/section_0100/0280-0020-0210-0100.html","current_through":"Montana Code Annotated 2025","vintage":"","retrieved_at":"2026-09-14T04:50:45Z","sha256":"1a3c8e954e7629ab58a2b6aadefc2c3efb27298fdafff461565d64411ae937f3","source_id":"us-mt","stale":false,"prev":"us-mt/28-2-2108","next":"us-mt/28-2-2111"},"notice":"GroundRules: Original legal text. Not legal advice."}
