{"data":{"id":"us-mt/50-60-605","jurisdiction":"us-mt","citation":"50-60-605","heading":"Power supplier not to energize installation without electrical permit.","body":"Individuals, firms, cooperatives, corporations, or municipalities selling electricity are power suppliers. Except for temporary connections that the department of labor and industry may authorize by rule for a period not exceeding 14 days without a preconnection inspection, power suppliers may not connect with or energize an electrical installation under this part unless the owner or a licensed electrical contractor has delivered to the power supplier an electrical permit covering the installation, issued by the department of labor and industry or a county, city, or town certified to enforce the electrical code pursuant to 50-60-302.","path":["TITLE 50. HEALTH AND SAFETY","CHAPTER 60. BUILDING CONSTRUCTION STANDARDS","Part 6. Electrical Installations"],"source_url":"https://mca.legmt.gov/bills/mca/title_0500/chapter_0600/part_0060/section_0050/0500-0600-0060-0050.html","current_through":"Montana Code Annotated 2025","vintage":"","retrieved_at":"2026-09-14T04:56:35Z","sha256":"ec5d556b3b12bb7cf2923c7935bca5d9902198a8c900a244c83fffd44d805d63","source_id":"us-mt","stale":false,"prev":"us-mt/50-60-604","next":"us-mt/50-60-606"},"notice":"GroundRules: Original legal text. Not legal advice."}
