{"data":{"id":"us-mt/69-8-1007","jurisdiction":"us-mt","citation":"69-8-1007","heading":"Renumbered 69-3-2007.","body":"","path":["TITLE 69. PUBLIC UTILITIES AND CARRIERS","CHAPTER 8. ELECTRIC UTILITY INDUSTRY GENERATION REINTEGRATION","Part 10. Renewable Power Production and Rural Economic Development (Renumbered)"],"source_url":"https://mca.legmt.gov/bills/mca/title_0690/chapter_0080/part_0100/section_0070/0690-0080-0100-0070.html","current_through":"Montana Code Annotated 2025","vintage":"","retrieved_at":"2026-09-14T04:58:20Z","sha256":"e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855","source_id":"us-mt","stale":false,"prev":"us-mt/69-8-1006","next":"us-mt/69-8-1008"},"notice":"GroundRules: Original legal text. Not legal advice."}
