{"data":{"id":"us-mt/75-20-409","jurisdiction":"us-mt","citation":"75-20-409","heading":"Optional annual installments for location of facility on landowner's property.","body":"A landowner upon whose land a facility is proposed to be located has the option of receiving any negotiated settlement for use of the landowner's land, if and when the land is used for a facility, by easement, right-of-way, or other legal conveyance in either a lump sum or in not more than five consecutive annual installments.","path":["TITLE 75. ENVIRONMENTAL PROTECTION","CHAPTER 20. MAJOR FACILITY SITING","Part 4. Postcertification and Legal Responsibilities"],"source_url":"https://mca.legmt.gov/bills/mca/title_0750/chapter_0200/part_0040/section_0090/0750-0200-0040-0090.html","current_through":"Montana Code Annotated 2025","vintage":"","retrieved_at":"2026-09-14T04:59:56Z","sha256":"52e4b67de9e5f9551efdf43b2710de3c89b9c896a4855be6b5e6b0d6f27c10e6","source_id":"us-mt","stale":false,"prev":"us-mt/75-20-408","next":"us-mt/75-20-410"},"notice":"GroundRules: Original legal text. Not legal advice."}
