{"data":{"id":"us-mt/85-7-1414","jurisdiction":"us-mt","citation":"85-7-1414","heading":"Determination of cost.","body":"An issuer, in determining costs for purposes of 85-7-1413, may include:\n(1) all costs and estimated costs of the issuance of the bonds;\n(2) all engineering, inspection, fiscal, and legal expenses; and\n(3) interest that it estimates will accrue during the construction period and for 6 months thereafter on money borrowed or that it estimates will be borrowed.","path":["TITLE 85. WATER USE","CHAPTER 7. IRRIGATION DISTRICTS","Part 14. Irrigation District Revenue Bond Act"],"source_url":"https://mca.legmt.gov/bills/mca/title_0850/chapter_0070/part_0140/section_0140/0850-0070-0140-0140.html","current_through":"Montana Code Annotated 2025","vintage":"","retrieved_at":"2026-09-14T05:01:21Z","sha256":"248deeaf7d53559c121f222d574fc99da06454ec10c6c838884de1fe9ad25589","source_id":"us-mt","stale":false,"prev":"us-mt/85-7-1413","next":"us-mt/85-7-1415"},"notice":"GroundRules: Original legal text. Not legal advice."}
