{"data":{"id":"us-nc/n.c.-gen.-stat.-136-189.22","jurisdiction":"us-nc","citation":"N.C. Gen. Stat. § 136-189.22","heading":"High-impact and low-cost construction projects.","body":"Of the funds appropriated to the Mobility/Modernization Fund in the Highway Fund, forty-eight percent (48%) of the funds shall be used for construction projects that are high impact and low cost. The funds shall be allocated equally among the 14 highway divisions. Projects funded under this section include intersection improvement projects, minor widening projects, and operational improvement projects. The Department shall develop a quantitative, evidence-based formula to use in selecting projects to receive funding under this section. At a minimum, the Department shall consider all of the following in developing the formula required by this section:\n(1)\tThe average daily traffic volume of a roadway and whether the proposed project will generate additional traffic.\n(2)\tAny restrictions on a roadway.\n(3)\tAny safety issues with a roadway.\n(4)\tThe condition of the lanes, shoulders, and pavement on a roadway.\n(5)\tThe sight distance and radius of any intersection on a roadway. (2019-231, s. 4.12(a).)","path":["Chapter 136. Transportation.","Article 14C. Mobility/Modernization Fund."],"source_url":"https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_136/GS_136-189.22.html","current_through":"S.L. 2026-30","vintage":"","retrieved_at":"2026-08-27T18:21:47Z","sha256":"8ea44aec8305a999742390990a3a4b40688ba2c859ea4f294f0ac9eba51a5085","source_id":"us-nc","stale":false,"prev":"us-nc/n.c.-gen.-stat.-136-189.21","next":"us-nc/n.c.-gen.-stat.-136-189.23"},"notice":"GroundRules: Original legal text. Not legal advice."}
