{"data":{"id":"us-nc/n.c.-gen.-stat.-136-89.183c","jurisdiction":"us-nc","citation":"N.C. Gen. Stat. § 136-89.183C","heading":"Accelerated Yadkin River Veterans Memorial Bridge Replacement Project.","body":"(a)\tContract for Accelerated Construction of the Yadkin River Veterans Memorial Bridge Replacement Bridge Project. - The Authority shall study, plan, develop, undertake preliminary design work, and analyze and list all necessary permits, in preparation for construction of a replacement bridge and approaches for the Yadkin River Veterans Memorial Bridge over the Yadkin River and between Rowan and Davidson Counties, in order to provide accelerated, efficient, and cost-effective completion of the project.\n(b)\tReplacement Bridge; Termini. - The bridge constructed pursuant to this section shall be a replacement bridge, with north and south termini located in general proximity to the termini of the existing Yadkin River Veterans Memorial Bridge. (2007-299, s. 1; 2012-42, s. 3.)","path":["Chapter 136. Transportation.","Article 6H. Public Toll Roads and Bridges.","Part 1. Turnpike Authority and Toll Projects."],"source_url":"https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_136/GS_136-89.183C.html","current_through":"S.L. 2026-30","vintage":"","retrieved_at":"2026-08-27T18:21:47Z","sha256":"aaebb961bbbf2d1b55e4475a4e69ff3adeaf44f8910c72561685693524f8f986","source_id":"us-nc","stale":false,"prev":"us-nc/n.c.-gen.-stat.-136-89.183b","next":"us-nc/n.c.-gen.-stat.-136-89.184"},"notice":"GroundRules: Original legal text. Not legal advice."}
