{"data":{"id":"us-nd/n.d.-cent.-code-24-01-43","jurisdiction":"us-nd","citation":"N.D. Cent. Code § 24-01-43","heading":"Utility facility - Removal","body":"Any utility or transmission line hereinafter constructed contrary to the provisions of section 24-01-42 must be removed at the expense of the utility, when such removal is required for purposes of highway expansion.","path":["Title 24 Highways, Bridges, And Ferries","Chapter 24-01 State Highway System"],"source_url":"https://ndlegis.gov/cencode/t24c01.pdf","current_through":"2026-07-31T11:12:02","vintage":"","retrieved_at":"2026-09-02T21:04:14Z","sha256":"d80336ae6be287ee038c170cb49f87d0eb2075d57f01b37c7686017750d3f60d","source_id":"us-nd","stale":true,"prev":"us-nd/n.d.-cent.-code-24-01-42","next":"us-nd/n.d.-cent.-code-24-01-44"},"notice":"GroundRules: Original legal text. Not legal advice."}
