{"data":{"id":"us-nd/n.d.-cent.-code-26.1-22-22","jurisdiction":"us-nd","citation":"N.D. Cent. Code § 26.1-22-22","heading":"Waiver of subrogation rights during construction","body":"The office may waive any right of the fund to recover for damage sustained by any structure as a result of fire or explosion caused by a contractor, its employees or agents, in the performance of a contract for the alteration of, or the construction of an addition to, a building insured under the fund.","path":["Title 26.1 Insurance","Chapter 26.1-22 State Fire And Tornado Fund"],"source_url":"https://ndlegis.gov/cencode/t26-1c22.pdf","current_through":"2026-07-31T11:12:02","vintage":"","retrieved_at":"2026-09-02T21:04:14Z","sha256":"7203804efa9c74d85a244c508bce6c824d5381ea7b511b3e222579848d921c3b","source_id":"us-nd","stale":true,"prev":"us-nd/n.d.-cent.-code-26.1-22-21.1","next":"us-nd/n.d.-cent.-code-26.1-23.1-01"},"notice":"GroundRules: Original legal text. Not legal advice."}
