{"data":{"id":"us-nd/n.d.-cent.-code-35-24-07","jurisdiction":"us-nd","citation":"N.D. Cent. Code § 35-24-07","heading":"Rights of subcontractor against contract price","body":"Nothing in this chapter may be deemed to fix a greater liability upon an owner in favor of any claimant under an original contractor than the amount for which the owner would be liable to the original contractor; provided, however, that the risk of all payments made to the original contractor is upon the owner after the receipt of notice that a lien is claimed by a person other than the original contractor; and provided further, that an owner does not have the right to offset obligations of the original contractor unless such obligations arise out of the original contract.","path":["Title 35 Liens","Chapter 35-24 Well Or Pipeline Construction Lien"],"source_url":"https://ndlegis.gov/cencode/t35c24.pdf","current_through":"2026-07-31T11:12:02","vintage":"","retrieved_at":"2026-09-02T21:04:14Z","sha256":"f603bff9c0c5b27909e373ab47c506273d88fb891d999949be26ab5341fdca4f","source_id":"us-nd","stale":true,"prev":"us-nd/n.d.-cent.-code-35-24-06","next":"us-nd/n.d.-cent.-code-35-24-08"},"notice":"GroundRules: Original legal text. Not legal advice."}