{"data":{"id":"us-nd/n.d.-cent.-code-49-05-18","jurisdiction":"us-nd","citation":"N.D. Cent. Code § 49-05-18","heading":"Planning reserve margin - Penalty","body":"The commission may require action, assess a disallowance or fine, or provide a penalty in accordance with chapter 49-07 if an electric public utility fails to meet the minimum capacity requirement and reserve margin. Unless otherwise set by the commission, the minimum capacity requirement and planning reserve margin is as set by the regional transmission organization to which the electric public utility belongs.","path":["Title 49 Public Utilities","Chapter 49-05 Procedure On Regulation Of Public Utilities"],"source_url":"https://ndlegis.gov/cencode/t49c05.pdf","current_through":"2026-07-31T11:12:02","vintage":"","retrieved_at":"2026-09-02T21:04:14Z","sha256":"e7be9db3f9c1c8acf72e3e269f827b0ff7ad4398315448e3432b33ca50d5036d","source_id":"us-nd","stale":true,"prev":"us-nd/n.d.-cent.-code-49-05-17","next":"us-nd/n.d.-cent.-code-49-05-19"},"notice":"GroundRules: Original legal text. Not legal advice."}
