{"data":{"id":"us-nd/n.d.-cent.-code-61-16.1-14","jurisdiction":"us-nd","citation":"N.D. Cent. Code § 61-16.1-14","heading":"Contracts for construction or maintenance of project","body":"If the cost of construction or maintenance of a project does not exceed the amount provided for construction of a public improvement under section 48-01.2-02, the work may be done on a day work basis or a contract may be let without being advertised. If the cost of the construction or maintenance exceeds the amount provided for construction of a public improvement under section 48-01.2-02, the board must let a contract in accordance with chapter 48-01.2.","path":["Title 61 Waters","Chapter 61-16.1 Operation Of Water Resource Districts"],"source_url":"https://ndlegis.gov/cencode/t61c16-1.pdf","current_through":"2026-07-31T11:12:02","vintage":"","retrieved_at":"2026-09-02T21:04:14Z","sha256":"81b5e5a5b36371850db88a73bd0cc29c9a5e34ef2a0b97568d9da9503c831eba","source_id":"us-nd","stale":true,"prev":"us-nd/n.d.-cent.-code-61-16.1-13","next":"us-nd/n.d.-cent.-code-61-16.1-15"},"notice":"GroundRules: Original legal text. Not legal advice."}
