{"data":{"id":"us-nd/n.d.-cent.-code-61-24.8-10","jurisdiction":"us-nd","citation":"N.D. Cent. Code § 61-24.8-10","heading":"Approval of plans, specifications, and estimates","body":"After receiving the engineer's report required by section 61-24.8-09, the board may direct the engineer to prepare detailed plans and specifications for construction of the improvement. The plans and specifications must be certified by a registered professional engineer and must be approved by a resolution of the board.","path":["Title 61 Waters","Chapter 61-24.8 Garrison Diversion Conservancy District Irrigation Special Assessments"],"source_url":"https://ndlegis.gov/cencode/t61c24-8.pdf","current_through":"2026-07-31T11:12:02","vintage":"","retrieved_at":"2026-09-02T21:04:14Z","sha256":"16f83c19cf4a861a9439ffcc0ba653c09c688b2ceaa2ded571ac7ec9daf6ddda","source_id":"us-nd","stale":true,"prev":"us-nd/n.d.-cent.-code-61-24.8-09","next":"us-nd/n.d.-cent.-code-61-24.8-11"},"notice":"GroundRules: Original legal text. Not legal advice."}
