{"data":{"id":"us-nd/n.d.-cent.-code-61-35-32","jurisdiction":"us-nd","citation":"N.D. Cent. Code § 61-35-32","heading":"Cost of project - How determined","body":"In determining the cost of a project, the board may include the estimated cost of bond issuance, all engineering, inspection, fiscal, and legal expenses, any bond reserves, and the estimated interest that will accrue during construction, and within six months after completion of construction.","path":["Title 61 Waters","Chapter 61-35 Water Districts"],"source_url":"https://ndlegis.gov/cencode/t61c35.pdf","current_through":"2026-07-31T11:12:02","vintage":"","retrieved_at":"2026-09-02T21:04:14Z","sha256":"17626368f84c82b6871a63fd18238a244c7c022e5c358720912bd3eaa9b1726a","source_id":"us-nd","stale":true,"prev":"us-nd/n.d.-cent.-code-61-35-31","next":"us-nd/n.d.-cent.-code-61-35-33"},"notice":"GroundRules: Original legal text. Not legal advice."}
