{"data":{"id":"us-ne/neb.-rev.-stat.-13-2905","jurisdiction":"us-ne","citation":"Neb. Rev. Stat. § 13-2905","heading":"Neb. Rev. Stat. § 13-2905","body":"The political subdivision shall adopt policies for entering into a design-build contract or construction management at risk contract. The policies shall require that such contracts include the following:\n\n(1) Procedures for selecting and hiring on its behalf a performance-criteria developer when soliciting and executing a design-build contract. The procedures shall be consistent with the Nebraska Consultants' Competitive Negotiation Act and shall provide that the performance-criteria developer (a) is ineligible to be included as a provider of any services in a proposal for the project on which it has acted as performance-criteria developer and (b) is not employed by or does not have a financial or other interest in a design-builder or construction manager who will submit a proposal;\n\n(2) Procedures for the preparation and content of requests for proposals;\n\n(3) Procedures and standards to be used to prequalify design-builders and construction managers. The procedures and standards shall provide that the political subdivision will evaluate prospective design-builders and construction managers based on the information submitted to the political subdivision in response to a request for letters of interest and will select design-builders or construction managers who are prequalified and consequently eligible to respond to the request for proposals;\n\n(4) Procedures for preparing and submitting proposals;\n\n(5) Procedures for evaluating proposals in accordance with sections 13-2908 , 13-2910 , and 13-2911 ;\n\n(6) Procedures for negotiations between the political subdivision and the design-builders or construction managers submitting proposals prior to the acceptance of a proposal if any such negotiations are contemplated;\n\n(7) Procedures for filing and acting on formal protests relating to the solicitation or execution of design-build contracts or construction management at risk contracts; and\n\n(8) Procedures for the evaluation of construction under a design-build contract by the performance-criteria developer to determine adherence to the performance criteria.","path":["NE Code","Chapter 13"],"source_url":"https://nebraskalegislature.gov/laws/statutes.php?statute=13-2905","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:21Z","sha256":"7cb3111c7e0e3315c151612552e9561815f19bc85dc651e73af385518ba9db80","source_id":"us-ne","stale":false,"prev":"us-ne/neb.-rev.-stat.-13-2904","next":"us-ne/neb.-rev.-stat.-13-2906"},"notice":"GroundRules: Original legal text. Not legal advice."}
