{"data":{"id":"us-ne/neb.-rev.-stat.-39-2812","jurisdiction":"us-ne","citation":"Neb. Rev. Stat. § 39-2812","heading":"Neb. Rev. Stat. § 39-2812","body":"(1) The process for selecting a design-builder and entering into a design-build contract shall be in accordance with sections 39-2813 to 39-2816 .\n\n(2) Except as otherwise specifically provided in the Transportation Innovation Act, the process for selecting a progressive design-builder and entering into a progressive design-build contract shall be in accordance with sections 39-2813 to 39-2816 .","path":["NE Code","Chapter 39"],"source_url":"https://nebraskalegislature.gov/laws/statutes.php?statute=39-2812","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:21Z","sha256":"8840ce03f30d44a60c75800cb09c4904632113e1ba3252e4439ebf62e776e0c6","source_id":"us-ne","stale":false,"prev":"us-ne/neb.-rev.-stat.-39-2811","next":"us-ne/neb.-rev.-stat.-39-2813"},"notice":"GroundRules: Original legal text. Not legal advice."}
