{"data":{"id":"us-ne/neb.-rev.-stat.-39-2821","jurisdiction":"us-ne","citation":"Neb. Rev. Stat. § 39-2821","heading":"Neb. Rev. Stat. § 39-2821","body":"A design-build contract, a progressive design-build contract, and a construction manager-general contractor contract may be conditioned upon later refinements in scope and price and may permit the contracting agency in agreement with the design-builder, progressive design-builder, or construction manager to make changes in the project without invalidating the contract.","path":["NE Code","Chapter 39"],"source_url":"https://nebraskalegislature.gov/laws/statutes.php?statute=39-2821","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:21Z","sha256":"e4fbb4b2b9af65e3d87a3e8fe846e8a0e3c51cfcb8f3d6c243d61e79a3d50dcd","source_id":"us-ne","stale":false,"prev":"us-ne/neb.-rev.-stat.-39-2820","next":"us-ne/neb.-rev.-stat.-39-2822"},"notice":"GroundRules: Original legal text. Not legal advice."}