{"data":{"id":"us-ne/neb.-rev.-stat.-39-826.02","jurisdiction":"us-ne","citation":"Neb. Rev. Stat. § 39-826.02","heading":"Neb. Rev. Stat. § 39-826.02","body":"If a natural resources district shall receive notice of a proposed bridge or culvert pursuant to section 39-826.01 , the district shall make a study to determine whether it would be practicable to construct a dam at or near the proposed site which could be used to support a highway or road. In making the study, such district shall consider the benefit which would be derived and the feasibility of such a dam. After it has made its determination, the natural resources district shall notify the Department of Transportation or the county board and shall, if the district favors such a dam, assist in the joint feasibility study and provide any other assistance which may be required.","path":["NE Code","Chapter 39"],"source_url":"https://nebraskalegislature.gov/laws/statutes.php?statute=39-826.02","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:21Z","sha256":"b74906a58c6de594b56370e6308d4a6f7bb4c1592141df14566dfb5e995adc15","source_id":"us-ne","stale":false,"prev":"us-ne/neb.-rev.-stat.-39-826.01","next":"us-ne/neb.-rev.-stat.-39-827"},"notice":"GroundRules: Original legal text. Not legal advice."}
